Chapter 8 of 19 · Understand your project
Your 30-day growth plan
Generate the plan, work through it week by week, and use the three kinds of task: agent prompts, drafted posts and short checklists.
The plan turns the analysis into a month of tasks, starting with fixing the repository before any posting. Open Growth Plan in the sidebar.
Step 1: generate it
The plan is not created by the analysis; you ask for it. Press Generate 30-day plan (or Create a 30-day plan on the dashboard). This spends tokens. Later, Regenerate 30-day plan builds a fresh one.
How the plan is shaped
- Day 1 is a single task: have your coding agent fix every open fix.
- Promotional posts are spread out, at most one outreach post a week.
- A Show HN comes no earlier than day 14, once the repository is ready for it.
- Day 30 is a review of the month.
Tasks are grouped by week, each with its day, category, channel and effort (from "under 30 min" to "a day or more"). Overdue tasks are marked. Filter by All, Planned, In Progress, Completed or Skipped.
Step 2: work through the tasks
Open a task to see its Objective, Starting point and a guide. There are three kinds:
Repository tasks: done by your coding agent
Documentation, examples, demos, housekeeping and release tasks are done in your own checkout. The guide, How to do this with your coding agent, tells you to connect a coding agent (see the next chapter), press Copy agent prompt, paste it into the agent, review the changes and open a pull request.
Post tasks: drafted for you
Tasks with a channel have Draft this post, which opens the Content Studio with the channel and task already set. If the channel is not connected yet, the button reads Connect followed by the channel name.
Manual tasks: a short checklist
Everything else has How to do this: a few steps and a line saying "You are done when". Community tasks link to the Growth Inbox; writing tasks have Start a draft.
Step 3: mark progress
Set each task's status to Planned, In progress, Completed or Skipped. Your follow-through rating on the dashboard comes from this.
Tasks that cover repository fixes complete themselves: when every fix a task covers is done or dismissed, it shows "Done: the fix it covers was completed". If a fix reopens, so does the task. Orviqa never changes a task you set by hand.
If an older plan warns that it does not link its items to fix tasks, regenerate it to get this behaviour.