Orviqa

Chapter 4 of 19 · Understand your project

Your dashboard: the next action and where the project stands

What each part of the dashboard means, how the next action is chosen, and how the five ratings in Where the project stands are worked out.

The dashboard is the page to open whenever you come back to Orviqa. It answers two questions: what should I do now, and how is the project doing?

The header

At the top is the active repository with links to GitHub, Re-check (a free re-read of the repository) and the analysis buttons. Below it are tiles for stars, forks, open issues and the last push.

If nothing has read the repository for an hour, opening the dashboard re-reads it in the background. This is free.

Do this first: the next action

The Do this first card is the single most useful thing to do right now. It is chosen by fixed rules, not by a model, so it costs nothing. In order of priority:

SituationWhat it asks you to do
A post failed to publishSee why and retry
A connected account stopped workingReconnect
A critical README fix is openOpen a README pull request
A plan task is dueOpen the plan
A discussion is worth replying toDraft a reply
A new release has not been announcedDraft an announcement
A promotion is ready to goDraft the post
None of the abovePublish the project page

Each recommendation shows what it is Based on, the Effort it takes, what it Needs, and where You will see it, so you can judge it instead of taking it on trust. A Then list shows what comes after.

If an action is blocked, it keeps its place but the button changes to Reconnect GitHub or Add tokens.

Where the project stands

This card rates five parts of the project as strong, ok, weak or unknown. Each part shows the rule that produced its rating and a Next step.

PartHow it is rated
READMEScore on the README grader rubric: strong at 75 or more, ok at 50 or more
Repository basicsStrong with no critical or important check missing; ok with no critical one missing
Findability on GitHubOne point each for a description, at least three topics and a homepage: strong at three, ok at two
Follow-throughThe share of plan tasks due in the last 30 days that you finished: strong at 70%, ok at 40%
MeasurementStrong with daily readings and GitHub traffic, ok with readings alone

There is deliberately no overall score and no adoption part. Stars are not users, and a single number would hide which part is weak.

The rest of the dashboard

  • Project summary and Biggest constraint: the analysis in two lines. Full analysis opens the detail, covered in the next chapter.
  • What to fix first: the README and repository fixes, counted as critical and important.
  • Where to promote: communities to post in once the fixes are done.
  • Upcoming growth actions: the next tasks from your 30-day plan, or Create a 30-day plan if you have none.
  • A Growth Inbox banner with Open the Growth Inbox.
  • Recent releases and Recent commits.